a large blue pipe sitting inside of a building

Camp Fretterd WWTP Upgrade Design

Project involved the electrical design of a new packaged water booster station and a new submersible well pump. The booster station work included the providing of electrical service to the station from the existing 15KV underground electrical distribution system that runs thru out the Camp Fretterd facilities. This required the providing of a new pad mounted 112.5KVA, three phase,  13,200V. to  480/277V. transformer, primary underground service feeder to the transformer and secondary underground feeder to a pedestal mounted distribution system which in turn supplied power to the packaged water booster stations electrical system(s). Work also including the re-serving and controls for the running track lighting adjacent to the booster station.

The Well no. 2 work included obtaining a power supply from the existing pump house for the new well and connecting to the existing well controls to interface the new well pump controller.

Project Type: Environmental, Federal,

a room filled with lots of different types of tanks