Glenelg High School HVAC Replacement

Gipe Associates, Inc. provided MEP engineering associated with the feasibility study to identify the renovation and modernization needs at the school, as well as the cost to meet the needs.  The firm subsequently provided MEP design for the renovations to the facility. The electrical scope of work included; provided new power panels and all associated connections to the additional mechanical equipment, New lighting, All other electrical ceiling mounted devices(power, data, special systems), were removed and reinstalled in the new ceiling, all electrical devices (power, data, special systems) mounted on the wall and conflicting with the lowered ceiling space were removed and reinstalled to conform to the new ceiling height.  $4.1M

Project Type: K-12,