a large green machine in a building

Leeds Elementary School Boiler Replacement

Mechanical and plumbing engineering design for the partial systemic renovation of the building’s heating plant.  A new 6900 mbh fire tube boiler and associated 10,000 gallon double wall underground fuel oil storage tank was provided along with new accessory equipment and controls. A new propane-fired domestic water heater was designed and select existing equipment was salvageable and therefore specified to be re-used.

Project Type: K-12,

a room filled with lots of pipes and equipment
a large green machine in a building