Spring Ridge Middle School Renovation & Addition
Mechanical, electrical and plumbing engineering design for the renovation and addition to the Spring Ridge Middle School. This was project was a phased while occupied renovation and included HVAC replacement, interior and exterior lighting and controls, power distribution, IT wiring, security systems, fire alarm and telecommunications systems renovations. HVAC renovation included all 15 air handlers (direct expansion rooftops), two (2)circular pumps, and all associated ductwork. A centralized sprinkler system was also added to the school. The STEM area was renovated and a 3,000 sf addition addressed the student population that was previously housed in relocatable classrooms.
Project Type: K-12,